Skip to main content
Best Web Developer — web design, development and digital growth agency
Language and currency EN CHF CHF

Language

  • More languages coming soon

Currency

Prices on this site are shown in the currency you choose.

Calculators

Concrete Volume Calculator

Calculate concrete volume for slabs, footings and round columns in cubic yards, cubic metres and premix bags, with waste.

  • Runs in your browser
  • Nothing uploaded

The tool

Enter your numbers below. Results update as you type, and nothing leaves your browser.

Everything you enter stays on your own machine. Nothing is sent to us or to anyone else, which you can confirm in your browser network tab.

What people use it for

  • Ordering ready-mix for a slab or patio
  • Counting bags for fence posts
  • Estimating footing concrete
  • Pricing concrete work

About this tool

What the Concrete Volume Calculator does

Concrete is ordered by volume: cubic yards in the US, cubic metres elsewhere. Multiply length by width by depth for slabs and footings, or use πr² × height for round columns, then add a waste allowance for spillage and uneven ground. Small jobs are often mixed from 60 or 80 lb bags.

Formula

  • Slab volume = length × width × thickness
  • Column volume = π × (diameter ÷ 2)² × height
  • 1 cubic yard = 27 cubic feet; 1 cubic metre = 35.31 cubic feet
  • Total = volume × pours × (1 + waste)

Worked example

Using the starting values in the calculator above:

Input Value
Units Feet and inches
Shape Slab, footing or wall
Length (or column height) 20
Width 10
Thickness or depth 4
Column diameter 12
Number of pours 1
Waste allowance 10%
Result Value
Cubic yards 2.72
Cubic metres 2.08
80 lb bags (0.6 cu ft each) 123
60 lb bags (0.45 cu ft each) 163
Cubic feet 73.3

How to read the result

Ready-mix suppliers usually sell in quarter or half-yard increments and may charge a short-load fee for small orders. Round up rather than run short mid-pour.

Above roughly a cubic yard, ready-mix is usually cheaper and gives a more consistent pour than mixing bags by hand.

Quantities are estimates. Check product data sheets and local codes, and confirm with your supplier before ordering.

Related calculators

  • Drywall Calculator: Calculate drywall sheets for walls and ceilings after openings, with screws, joint tape and joint compound estimates.
  • Paint Coverage Calculator: Calculate how many gallons of paint a room needs from wall area, doors, windows, ceiling, coats and coverage per gallon.
  • Painting Job Estimator: Estimate a painting job price from area, coats, production rate, labour rate, paint cost, prep time, supplies and markup.
  • Roofing Calculator: Calculate roof area from the footprint and pitch, roofing squares, shingle bundles, underlayment and nails.

Browse every calculator in Construction and Materials Calculators, or talk to us about websites for construction and trades businesses.

Questions

Questions about this tool

The things clients actually want to know — costs, timelines, ownership and what happens after launch.

Multiply length and width in feet by thickness in feet (inches ÷ 12), then divide by 27.

About 45 bags of 80 lb concrete or 60 bags of 60 lb, based on typical yields of 0.6 and 0.45 cubic feet.

Commonly 5% to 10% for spillage, form bulging and uneven subgrade.

Free strategy session

Let’s build something worth finding.

Tell us where you want the business to be in twelve months. We will come back with a costed plan, a realistic timeline, and the numbers we expect to move — no obligation, no jargon.

  • 30-minute call, no pitch deck
  • Fixed-price proposal in 48 hours
  • You own everything we build

Talk to a developer

Not a sales team

Response time
Within 1 business hour
Where we work
UK, USA & the Gulf
Contracts
No lock-in, monthly rolling
Working since
2023
infobestwebdeveloper.org

Free strategy session

Let’s build something worth finding.

Tell us where you want the business to be in twelve months. We will come back with a costed plan, a realistic timeline, and the numbers we expect to move — no obligation, no jargon.

  • 30-minute call, no pitch deck
  • Fixed-price proposal in 48 hours
  • You own everything we build

Talk to a developer

Not a sales team

Response time
Within 1 business hour
Where we work
UK, USA & the Gulf
Contracts
No lock-in, monthly rolling
Working since
2023
infobestwebdeveloper.org
Free consultation